PM

PM Feature Backlog with Priority Rating

Rate backlog items by PM instinct, then let the agent surface your top ten before sprint planning.

About this template

Sprint planning often starts from scratch because the backlog has no structured priority signal. The PM Feature Backlog with Priority Rating gives product managers a way to turn ten minutes of gut-feel clicks into a structured prioritization the agent can work from.

The template ships with a Feature Backlog sheet, a PM Rating field (0-5 stars), and a Sprint Board Kanban. Eighteen sample features across seven product areas. The Score Backlog Before Sprint Planning task walks you through rating unscored items and surfacing your top ten.

The PM Rating field stores an integer. Ask the agent 'What are the top ten features by PM rating?' and get a ranked list in seconds. Built for product managers who manage a 20-50 item backlog.